{"id":19986,"date":"2026-03-23T09:25:31","date_gmt":"2026-03-23T15:25:31","guid":{"rendered":"https:\/\/www.elpasoco.com\/?p=19986"},"modified":"2026-04-06T15:44:56","modified_gmt":"2026-04-06T21:44:56","slug":"beacon-lite-road-phase-1-work-zone-impacts-and-suggested-alternative-route","status":"publish","type":"post","link":"https:\/\/www.elpasoco.com\/beacon-lite-road-phase-1-work-zone-impacts-and-suggested-alternative-route\/","title":{"rendered":"Beacon Lite Road Phase 1 Work Zone Impacts and Suggested Alternative Route"},"content":{"rendered":"<div class=\"wpb-content-wrapper\"><p>[vc_row][vc_column][vc_column_text css=&#8221;&#8221;]<span data-olk-copy-source=\"MessageBody\"><strong>March 23, 2026<\/strong>\u00a0<\/span>&#8211;\u00a0El Paso County is continuing Phase 1 construction activities along Beacon Lite Road. Drivers should expect changing traffic conditions and potential delays in the project area between Wakonda Way and Bricker Road as crews complete trench excavation, utility relocations, and storm sewer installations.<\/p>\n<p>Traffic control measures will be adjusted as work progresses to foster the safe movement of traffic through the area. Drivers should follow posted signs and use extra caution near crews and equipment. Schedules are weather-dependent and may shift.<\/p>\n<p><strong>Work planned through April:<\/strong><\/p>\n<p>During this period, crews will focus on digging trenches, relocating utilities, and installing storm sewers while completing the east half of the roadway alignment to subgrade elevation. Once the east half is completed, traffic will be shifted, and Phase 1 work will begin on the west half of the roadway.<\/p>\n<p><strong>Suggested alternate route:<\/strong><\/p>\n<p>To help reduce congestion and avoid delays, drivers may use the suggested alternate route shown on the map: Wakonda Way, Aries Drive, Indi Drive, and Palmer Divide Road. Follow posted signs.<\/p>\n<p>Large trucks and vehicles making deliveries that are not part of the construction project are especially encouraged to use the suggested alternate route to improve safety near the work zone.<\/p>\n<p><strong>What to expect in the project area:<\/strong><\/p>\n<ul>\n<li>Changing traffic patterns and potential delays<\/li>\n<li>Trucks and equipment entering and exiting the roadway<\/li>\n<li>Bicyclists should follow the same traffic pattern as motorists and use caution through the work zone.<\/li>\n<li>Emergency vehicles will travel through the work zone with traffic<\/li>\n<li>Pedestrians traveling through the work zone will need to walk on the shoulder<\/li>\n<li>Traffic control will be monitored daily by the traffic control team<\/li>\n<li>Schedule is weather-dependent and may change<\/li>\n<\/ul>\n<p><strong>Stay up to date:<\/strong><\/p>\n<ul>\n<li>Project phone:\u00a0<a title=\"tel:719-355-3797\" href=\"tel:719-355-3797\" data-auth=\"NotApplicable\" data-linkindex=\"1\">719-355-3797<\/a><\/li>\n<li>Project email:\u00a0<a title=\"mailto:beaconliterd@gmail.com\" href=\"mailto:beaconliterd@gmail.com\" data-linkindex=\"2\">beaconliterd@gmail.com<\/a><\/li>\n<li>Project website:\u00a0<a href=\"https:\/\/publicworks.elpasoco.com\/beacon-lite-road-project\/\">publicworks.elpasoco.com\/beacon-lite-road-project<\/a><\/li>\n<\/ul>\n<p><strong>Accessibility and language assistance:<\/strong><\/p>\n<p>For translation or accessible formats, contact<a title=\"tel:719-355-3797\" href=\"tel:719-355-3797\" data-auth=\"NotApplicable\" data-linkindex=\"4\">\u00a0719-355-3797<\/a>\u00a0or\u00a0<a title=\"mailto:beaconliterd@gmail.com\" href=\"mailto:beaconliterd@gmail.com\" data-linkindex=\"5\">beaconliterd@gmail.com<\/a>.<\/p>\n<p>\u00bfNecesita esta informaci\u00f3n en otro idioma o en un formato accesible? Llame al\u00a0<a title=\"tel:719-355-3797\" href=\"tel:719-355-3797\" data-auth=\"NotApplicable\" data-linkindex=\"6\">719-355-3797<\/a>\u00a0o escriba a\u00a0<a title=\"mailto:beaconliterd@gmail.com\" href=\"mailto:beaconliterd@gmail.com\" data-linkindex=\"7\">beaconliterd@gmail.com<\/a>.<\/p>\n<p> <\/p>\n<p><img loading=\"lazy\" decoding=\"async\" class=\"wp-image-19998 aligncenter\" src=\"https:\/\/epc-assets.elpasoco.com\/wp-content\/uploads\/Suggested-Alt-Route-Map-3.18.26-300x300.jpg\" alt=\"Project map showing the Beacon Lite Road work zone between Wakonda Way and Bricker Road, west of Interstate 25. A suggested alternate route is shown using Wakonda Way, Aries Drive, Indi Drive, and Palmer Divide Road to help drivers avoid delays near the work area. The map includes a north arrow and a legend.\" width=\"602\" height=\"602\" srcset=\"https:\/\/epc-assets.elpasoco.com\/wp-content\/uploads\/Suggested-Alt-Route-Map-3.18.26-300x300.jpg 300w, https:\/\/epc-assets.elpasoco.com\/wp-content\/uploads\/Suggested-Alt-Route-Map-3.18.26-1024x1024.jpg 1024w, https:\/\/epc-assets.elpasoco.com\/wp-content\/uploads\/Suggested-Alt-Route-Map-3.18.26-150x150.jpg 150w, https:\/\/epc-assets.elpasoco.com\/wp-content\/uploads\/Suggested-Alt-Route-Map-3.18.26-768x768.jpg 768w, https:\/\/epc-assets.elpasoco.com\/wp-content\/uploads\/Suggested-Alt-Route-Map-3.18.26.jpg 1080w\" sizes=\"auto, (max-width: 602px) 100vw, 602px\" \/>[\/vc_column_text][\/vc_column][\/vc_row]<\/p>\n<\/div>","protected":false},"excerpt":{"rendered":"<p>[vc_row][vc_column][vc_column_text css=&#8221;&#8221;]March 23, 2026\u00a0&#8211;\u00a0El Paso County is continuing Phase 1 construction activities along Beacon Lite Road. Drivers should expect changing traffic conditions and potential delays in the project area between Wakonda Way and Bricker Road as crews complete trench excavation, utility relocations, and storm sewer installations. Traffic control measures will be adjusted as work progresses&hellip;<\/p>\n","protected":false},"author":227,"featured_media":19299,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[1391,1673,23,24],"tags":[6518,7895,6942,7013],"class_list":["post-19986","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-featured-news","category-news","category-public-works","category-roads","tag-el-paso-county","tag-news","tag-public-works","tag-roads","category-1391","category-1673","category-23","category-24","description-off"],"yoast_head":"<!-- This site is optimized with the Yoast SEO Premium plugin v27.2 (Yoast SEO v27.2) - https:\/\/yoast.com\/product\/yoast-seo-premium-wordpress\/ -->\n<title>Beacon Lite Road Phase 1 Work Zone Impacts and Suggested Alternative Route - El Paso County Colorado<\/title>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/www.elpasoco.com\/beacon-lite-road-phase-1-work-zone-impacts-and-suggested-alternative-route\/\" \/>\n<meta property=\"og:locale\" content=\"en_US\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"Beacon Lite Road Phase 1 Work Zone Impacts and Suggested Alternative Route\" \/>\n<meta property=\"og:description\" content=\"[vc_row][vc_column][vc_column_text css=&#8221;&#8221;]March 23, 2026\u00a0&#8211;\u00a0El Paso County is continuing Phase 1 construction activities along Beacon Lite Road. Drivers should expect changing traffic conditions and potential delays in the project area between Wakonda Way and Bricker Road as crews complete trench excavation, utility relocations, and storm sewer installations. Traffic control measures will be adjusted as work progresses&hellip;\" \/>\n<meta property=\"og:url\" content=\"https:\/\/www.elpasoco.com\/beacon-lite-road-phase-1-work-zone-impacts-and-suggested-alternative-route\/\" \/>\n<meta property=\"og:site_name\" content=\"El Paso County Colorado\" \/>\n<meta property=\"article:published_time\" content=\"2026-03-23T15:25:31+00:00\" \/>\n<meta property=\"article:modified_time\" content=\"2026-04-06T21:44:56+00:00\" \/>\n<meta property=\"og:image\" content=\"https:\/\/epc-assets.elpasoco.com\/wp-content\/uploads\/Road-Work-1-1.png\" \/>\n\t<meta property=\"og:image:width\" content=\"600\" \/>\n\t<meta property=\"og:image:height\" content=\"600\" \/>\n\t<meta property=\"og:image:type\" content=\"image\/png\" \/>\n<meta name=\"author\" content=\"kristiandemsky@elpasoco.com\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<meta name=\"twitter:label1\" content=\"Written by\" \/>\n\t<meta name=\"twitter:data1\" content=\"kristiandemsky@elpasoco.com\" \/>\n\t<meta name=\"twitter:label2\" content=\"Est. reading time\" \/>\n\t<meta name=\"twitter:data2\" content=\"2 minutes\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\/\/schema.org\",\"@graph\":[{\"@type\":\"Article\",\"@id\":\"https:\/\/www.elpasoco.com\/beacon-lite-road-phase-1-work-zone-impacts-and-suggested-alternative-route\/#article\",\"isPartOf\":{\"@id\":\"https:\/\/www.elpasoco.com\/beacon-lite-road-phase-1-work-zone-impacts-and-suggested-alternative-route\/\"},\"author\":{\"name\":\"kristiandemsky@elpasoco.com\",\"@id\":\"https:\/\/www.elpasoco.com\/#\/schema\/person\/b37156be076f1a596eb88a90ce3c669f\"},\"headline\":\"Beacon Lite Road Phase 1 Work Zone Impacts and Suggested Alternative Route\",\"datePublished\":\"2026-03-23T15:25:31+00:00\",\"dateModified\":\"2026-04-06T21:44:56+00:00\",\"mainEntityOfPage\":{\"@id\":\"https:\/\/www.elpasoco.com\/beacon-lite-road-phase-1-work-zone-impacts-and-suggested-alternative-route\/\"},\"wordCount\":360,\"image\":{\"@id\":\"https:\/\/www.elpasoco.com\/beacon-lite-road-phase-1-work-zone-impacts-and-suggested-alternative-route\/#primaryimage\"},\"thumbnailUrl\":\"https:\/\/epc-assets.elpasoco.com\/wp-content\/uploads\/Road-Work-1-1.png\",\"keywords\":[\"El Paso County\",\"news\",\"public works\",\"roads\"],\"articleSection\":[\"FEATURED NEWS\",\"NEWS\",\"Public Works\",\"Roads\"],\"inLanguage\":\"en-US\"},{\"@type\":\"WebPage\",\"@id\":\"https:\/\/www.elpasoco.com\/beacon-lite-road-phase-1-work-zone-impacts-and-suggested-alternative-route\/\",\"url\":\"https:\/\/www.elpasoco.com\/beacon-lite-road-phase-1-work-zone-impacts-and-suggested-alternative-route\/\",\"name\":\"Beacon Lite Road Phase 1 Work Zone Impacts and Suggested Alternative Route - El Paso County Colorado\",\"isPartOf\":{\"@id\":\"https:\/\/www.elpasoco.com\/#website\"},\"primaryImageOfPage\":{\"@id\":\"https:\/\/www.elpasoco.com\/beacon-lite-road-phase-1-work-zone-impacts-and-suggested-alternative-route\/#primaryimage\"},\"image\":{\"@id\":\"https:\/\/www.elpasoco.com\/beacon-lite-road-phase-1-work-zone-impacts-and-suggested-alternative-route\/#primaryimage\"},\"thumbnailUrl\":\"https:\/\/epc-assets.elpasoco.com\/wp-content\/uploads\/Road-Work-1-1.png\",\"datePublished\":\"2026-03-23T15:25:31+00:00\",\"dateModified\":\"2026-04-06T21:44:56+00:00\",\"author\":{\"@id\":\"https:\/\/www.elpasoco.com\/#\/schema\/person\/b37156be076f1a596eb88a90ce3c669f\"},\"breadcrumb\":{\"@id\":\"https:\/\/www.elpasoco.com\/beacon-lite-road-phase-1-work-zone-impacts-and-suggested-alternative-route\/#breadcrumb\"},\"inLanguage\":\"en-US\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\/\/www.elpasoco.com\/beacon-lite-road-phase-1-work-zone-impacts-and-suggested-alternative-route\/\"]}]},{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\/\/www.elpasoco.com\/beacon-lite-road-phase-1-work-zone-impacts-and-suggested-alternative-route\/#primaryimage\",\"url\":\"https:\/\/epc-assets.elpasoco.com\/wp-content\/uploads\/Road-Work-1-1.png\",\"contentUrl\":\"https:\/\/epc-assets.elpasoco.com\/wp-content\/uploads\/Road-Work-1-1.png\",\"width\":600,\"height\":600,\"caption\":\"El Paso County logo followed by \\\"News Release\\\" on top of an Orange caution sign stating road work ahead\"},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\/\/www.elpasoco.com\/beacon-lite-road-phase-1-work-zone-impacts-and-suggested-alternative-route\/#breadcrumb\",\"itemListElement\":[{\"@type\":\"ListItem\",\"position\":1,\"name\":\"Home\",\"item\":\"https:\/\/www.elpasoco.com\/\"},{\"@type\":\"ListItem\",\"position\":2,\"name\":\"Beacon Lite Road Phase 1 Work Zone Impacts and Suggested Alternative Route\"}]},{\"@type\":\"WebSite\",\"@id\":\"https:\/\/www.elpasoco.com\/#website\",\"url\":\"https:\/\/www.elpasoco.com\/\",\"name\":\"El Paso County Colorado\",\"description\":\"\",\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"https:\/\/www.elpasoco.com\/?s={search_term_string}\"},\"query-input\":{\"@type\":\"PropertyValueSpecification\",\"valueRequired\":true,\"valueName\":\"search_term_string\"}}],\"inLanguage\":\"en-US\"},{\"@type\":\"Person\",\"@id\":\"https:\/\/www.elpasoco.com\/#\/schema\/person\/b37156be076f1a596eb88a90ce3c669f\",\"name\":\"kristiandemsky@elpasoco.com\",\"image\":{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\/\/secure.gravatar.com\/avatar\/4d346fef229df4cff4a15e1ffa1faa2a4dc3f0fa91ebb3371de391ac05682535?s=96&d=mm&r=g\",\"url\":\"https:\/\/secure.gravatar.com\/avatar\/4d346fef229df4cff4a15e1ffa1faa2a4dc3f0fa91ebb3371de391ac05682535?s=96&d=mm&r=g\",\"contentUrl\":\"https:\/\/secure.gravatar.com\/avatar\/4d346fef229df4cff4a15e1ffa1faa2a4dc3f0fa91ebb3371de391ac05682535?s=96&d=mm&r=g\",\"caption\":\"kristiandemsky@elpasoco.com\"}}]}<\/script>\n<!-- \/ Yoast SEO Premium plugin. -->","yoast_head_json":{"title":"Beacon Lite Road Phase 1 Work Zone Impacts and Suggested Alternative Route - El Paso County Colorado","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/www.elpasoco.com\/beacon-lite-road-phase-1-work-zone-impacts-and-suggested-alternative-route\/","og_locale":"en_US","og_type":"article","og_title":"Beacon Lite Road Phase 1 Work Zone Impacts and Suggested Alternative Route","og_description":"[vc_row][vc_column][vc_column_text css=&#8221;&#8221;]March 23, 2026\u00a0&#8211;\u00a0El Paso County is continuing Phase 1 construction activities along Beacon Lite Road. Drivers should expect changing traffic conditions and potential delays in the project area between Wakonda Way and Bricker Road as crews complete trench excavation, utility relocations, and storm sewer installations. Traffic control measures will be adjusted as work progresses&hellip;","og_url":"https:\/\/www.elpasoco.com\/beacon-lite-road-phase-1-work-zone-impacts-and-suggested-alternative-route\/","og_site_name":"El Paso County Colorado","article_published_time":"2026-03-23T15:25:31+00:00","article_modified_time":"2026-04-06T21:44:56+00:00","og_image":[{"width":600,"height":600,"url":"https:\/\/epc-assets.elpasoco.com\/wp-content\/uploads\/Road-Work-1-1.png","type":"image\/png"}],"author":"kristiandemsky@elpasoco.com","twitter_card":"summary_large_image","twitter_misc":{"Written by":"kristiandemsky@elpasoco.com","Est. reading time":"2 minutes"},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"Article","@id":"https:\/\/www.elpasoco.com\/beacon-lite-road-phase-1-work-zone-impacts-and-suggested-alternative-route\/#article","isPartOf":{"@id":"https:\/\/www.elpasoco.com\/beacon-lite-road-phase-1-work-zone-impacts-and-suggested-alternative-route\/"},"author":{"name":"kristiandemsky@elpasoco.com","@id":"https:\/\/www.elpasoco.com\/#\/schema\/person\/b37156be076f1a596eb88a90ce3c669f"},"headline":"Beacon Lite Road Phase 1 Work Zone Impacts and Suggested Alternative Route","datePublished":"2026-03-23T15:25:31+00:00","dateModified":"2026-04-06T21:44:56+00:00","mainEntityOfPage":{"@id":"https:\/\/www.elpasoco.com\/beacon-lite-road-phase-1-work-zone-impacts-and-suggested-alternative-route\/"},"wordCount":360,"image":{"@id":"https:\/\/www.elpasoco.com\/beacon-lite-road-phase-1-work-zone-impacts-and-suggested-alternative-route\/#primaryimage"},"thumbnailUrl":"https:\/\/epc-assets.elpasoco.com\/wp-content\/uploads\/Road-Work-1-1.png","keywords":["El Paso County","news","public works","roads"],"articleSection":["FEATURED NEWS","NEWS","Public Works","Roads"],"inLanguage":"en-US"},{"@type":"WebPage","@id":"https:\/\/www.elpasoco.com\/beacon-lite-road-phase-1-work-zone-impacts-and-suggested-alternative-route\/","url":"https:\/\/www.elpasoco.com\/beacon-lite-road-phase-1-work-zone-impacts-and-suggested-alternative-route\/","name":"Beacon Lite Road Phase 1 Work Zone Impacts and Suggested Alternative Route - El Paso County Colorado","isPartOf":{"@id":"https:\/\/www.elpasoco.com\/#website"},"primaryImageOfPage":{"@id":"https:\/\/www.elpasoco.com\/beacon-lite-road-phase-1-work-zone-impacts-and-suggested-alternative-route\/#primaryimage"},"image":{"@id":"https:\/\/www.elpasoco.com\/beacon-lite-road-phase-1-work-zone-impacts-and-suggested-alternative-route\/#primaryimage"},"thumbnailUrl":"https:\/\/epc-assets.elpasoco.com\/wp-content\/uploads\/Road-Work-1-1.png","datePublished":"2026-03-23T15:25:31+00:00","dateModified":"2026-04-06T21:44:56+00:00","author":{"@id":"https:\/\/www.elpasoco.com\/#\/schema\/person\/b37156be076f1a596eb88a90ce3c669f"},"breadcrumb":{"@id":"https:\/\/www.elpasoco.com\/beacon-lite-road-phase-1-work-zone-impacts-and-suggested-alternative-route\/#breadcrumb"},"inLanguage":"en-US","potentialAction":[{"@type":"ReadAction","target":["https:\/\/www.elpasoco.com\/beacon-lite-road-phase-1-work-zone-impacts-and-suggested-alternative-route\/"]}]},{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/www.elpasoco.com\/beacon-lite-road-phase-1-work-zone-impacts-and-suggested-alternative-route\/#primaryimage","url":"https:\/\/epc-assets.elpasoco.com\/wp-content\/uploads\/Road-Work-1-1.png","contentUrl":"https:\/\/epc-assets.elpasoco.com\/wp-content\/uploads\/Road-Work-1-1.png","width":600,"height":600,"caption":"El Paso County logo followed by \"News Release\" on top of an Orange caution sign stating road work ahead"},{"@type":"BreadcrumbList","@id":"https:\/\/www.elpasoco.com\/beacon-lite-road-phase-1-work-zone-impacts-and-suggested-alternative-route\/#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"Home","item":"https:\/\/www.elpasoco.com\/"},{"@type":"ListItem","position":2,"name":"Beacon Lite Road Phase 1 Work Zone Impacts and Suggested Alternative Route"}]},{"@type":"WebSite","@id":"https:\/\/www.elpasoco.com\/#website","url":"https:\/\/www.elpasoco.com\/","name":"El Paso County Colorado","description":"","potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/www.elpasoco.com\/?s={search_term_string}"},"query-input":{"@type":"PropertyValueSpecification","valueRequired":true,"valueName":"search_term_string"}}],"inLanguage":"en-US"},{"@type":"Person","@id":"https:\/\/www.elpasoco.com\/#\/schema\/person\/b37156be076f1a596eb88a90ce3c669f","name":"kristiandemsky@elpasoco.com","image":{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/secure.gravatar.com\/avatar\/4d346fef229df4cff4a15e1ffa1faa2a4dc3f0fa91ebb3371de391ac05682535?s=96&d=mm&r=g","url":"https:\/\/secure.gravatar.com\/avatar\/4d346fef229df4cff4a15e1ffa1faa2a4dc3f0fa91ebb3371de391ac05682535?s=96&d=mm&r=g","contentUrl":"https:\/\/secure.gravatar.com\/avatar\/4d346fef229df4cff4a15e1ffa1faa2a4dc3f0fa91ebb3371de391ac05682535?s=96&d=mm&r=g","caption":"kristiandemsky@elpasoco.com"}}]}},"publishpress_future_action":{"enabled":false,"date":"2026-05-10 19:57:11","action":"change-status","newStatus":"draft","terms":[],"taxonomy":"category","extraData":[]},"publishpress_future_workflow_manual_trigger":{"enabledWorkflows":[]},"_links":{"self":[{"href":"https:\/\/www.elpasoco.com\/wp-json\/wp\/v2\/posts\/19986","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.elpasoco.com\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.elpasoco.com\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.elpasoco.com\/wp-json\/wp\/v2\/users\/227"}],"replies":[{"embeddable":true,"href":"https:\/\/www.elpasoco.com\/wp-json\/wp\/v2\/comments?post=19986"}],"version-history":[{"count":2,"href":"https:\/\/www.elpasoco.com\/wp-json\/wp\/v2\/posts\/19986\/revisions"}],"predecessor-version":[{"id":19999,"href":"https:\/\/www.elpasoco.com\/wp-json\/wp\/v2\/posts\/19986\/revisions\/19999"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.elpasoco.com\/wp-json\/wp\/v2\/media\/19299"}],"wp:attachment":[{"href":"https:\/\/www.elpasoco.com\/wp-json\/wp\/v2\/media?parent=19986"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.elpasoco.com\/wp-json\/wp\/v2\/categories?post=19986"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.elpasoco.com\/wp-json\/wp\/v2\/tags?post=19986"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}