{"id":14813,"date":"2024-05-03T15:29:44","date_gmt":"2024-05-03T21:29:44","guid":{"rendered":"https:\/\/www.elpasoco.com\/?p=14813"},"modified":"2025-09-30T14:58:32","modified_gmt":"2025-09-30T20:58:32","slug":"traffic-advisory-week-of-may-05-military-access-mobility-safety-improvement-project","status":"publish","type":"post","link":"https:\/\/www.elpasoco.com\/traffic-advisory-week-of-may-05-military-access-mobility-safety-improvement-project\/","title":{"rendered":"Traffic Advisory \u2013 Week of May 05 Military Access, Mobility &amp; Safety Improvement Project"},"content":{"rendered":"<div class=\"wpb-content-wrapper\"><p>[vc_row][vc_column][vc_column_text css=&#8221;&#8221;]<\/p>\n<p style=\"font-weight: 400\"><span data-ogsc=\"black\"><strong>May 03, 2024-<\/strong> A northbound US 85\/87 right lane closure under the South Academy Boulevard bridge is scheduled on Sunday, May 5, 12 a.m. through Wednesday, May 8, 5 p.m. to allow crews to continue drainage pipe installation across the roadway.<\/span><\/p>\n<p style=\"font-weight: 400\"><span data-ogsc=\"black\">\u00a0<\/span><\/p>\n<p style=\"font-weight: 400\"><span data-ogsc=\"black\">Also, a minor lane shift to a new alignment will begin on Thursday, May 9, 12 p.m. on the southbound South Academy Boulevard off-ramp to US 85\/87 to allow crews to work on drainage pipes. Minor delays can be expected while constructing pavement for ramp shift. This shift will be in effect<\/span><span data-ogsc=\"black\"> approximately two weeks.<\/span><\/p>\n<p style=\"font-weight: 400\" data-ogsb=\"white\"><span data-ogsc=\"black\">A<strong> shift to a temporary on-ramp<\/strong> for drivers entering northbound South Academy Boulevard from US 85\/87 is ongoing as crews will perform work on roadway, drainage and utilities in the area. The ramp lane width will be reduced to 12 feet and speeds will be reduced to 30 MPH. This closure will be in effect approximately 5-6 months.<\/span><\/p>\n<p style=\"font-weight: 400\"><strong><span data-ogsc=\"black\">Motorists are advised to use caution at all entrance ramps as merge lengths have been shortened. <\/span><\/strong><span data-ogsc=\"black\">In particular, motorists should be prepared to stop on the <\/span><strong><span data-ogsc=\"black\">US 85\/87 on-ramp to eastbound South Academy <\/span><\/strong><span data-ogsc=\"black\">and the Bradley Road on-ramp to eastbound South Academy since merge area is greatly reduced. Work crews are installing signage and flashing beacons to alert traffic to the reduced merge lengths.<\/span><\/p>\n<p style=\"font-weight: 400\"><span data-ogsc=\"black\">All lanes of Bradley Road under South Academy Boulevard will be shifted to the center of the roadway ongoing to allow crews to perform work on new bridge piers.<\/span><\/p>\n<p style=\"font-weight: 400\"><span data-ogsc=\"black\">\u00a0<\/span><\/p>\n<p style=\"font-weight: 400\"><span data-ogsc=\"black\">A left lane closure is ongoing for northbound and southbound South Academy Boulevard over Bradley Road to allow crews to perform bridge work.<\/span><\/p>\n<p style=\"font-weight: 400\"><span data-ogsc=\"black\">\u00a0<\/span><\/p>\n<p style=\"font-weight: 400\"><span data-ogsc=\"black\">These closures are weather dependent and subject to change.<\/span><\/p>\n<p style=\"font-weight: 400\" data-ogsb=\"white\"><span data-ogsc=\"black\">\u00a0<\/span><\/p>\n<p style=\"font-weight: 400\" data-ogsb=\"white\"><strong>Traffic Impacts<\/strong><\/p>\n<p style=\"font-weight: 400\"><strong><span data-ogsc=\"black\">I-25 between US 85\/Fountain (MP 127) and South Academy Boulevard (MP 135)<\/span><\/strong><\/p>\n<ul style=\"font-weight: 400\">\n<li data-ogsc=\"black\" data-ogsb=\"white\"><span data-ogsc=\"rgb(30, 30, 30)\">Sunday, May 5, 7 p.m. to 6 a.m.<\/span><\/li>\n<\/ul>\n<ul style=\"font-weight: 400\">\n<li style=\"list-style-type: none\">\n<ul>\n<li data-ogsc=\"black\" data-ogsb=\"white\"><span data-ogsc=\"rgb(30, 30, 30)\">Northbound I-25 left lane closure at Mesa Ridge Parkway (MP 132).<\/span><\/li>\n<\/ul>\n<\/li>\n<\/ul>\n<ul style=\"font-weight: 400\">\n<li data-ogsc=\"black\" data-ogsb=\"white\">Monday, May 6 and Tuesday, May 7, 6 p.m. to 6 a.m.<\/li>\n<\/ul>\n<ul style=\"font-weight: 400\">\n<li style=\"list-style-type: none\">\n<ul>\n<li data-ogsc=\"rgb(33, 33, 33)\">Northbound<span data-ogsc=\"black\"> I-25 left lane closure at Mesa Ridge Parkway (MP 132).<\/span><\/li>\n<\/ul>\n<\/li>\n<\/ul>\n<ul style=\"font-weight: 400\">\n<li data-ogsc=\"black\" data-ogsb=\"white\"><span data-ogsc=\"rgb(30, 30, 30)\">Friday, May 10, 7 p.m. <\/span><span data-ogsc=\"black\">to 9 a.m.<\/span><\/li>\n<\/ul>\n<ul style=\"font-weight: 400\">\n<li style=\"list-style-type: none\">\n<ul>\n<li data-ogsc=\"rgb(33, 33, 33)\">Full closures of westbound <span data-ogsc=\"black\">South Academy Boulevard at I-25. Use detour route.<\/span><\/li>\n<\/ul>\n<\/li>\n<\/ul>\n<ul style=\"font-weight: 400\">\n<li data-ogsc=\"black\" data-ogsb=\"white\"><span data-ogsc=\"rgb(30, 30, 30)\">Friday, May 10, 8 p.m. <\/span><span data-ogsc=\"black\">to 9 a.m.<\/span><\/li>\n<\/ul>\n<ul style=\"font-weight: 400\">\n<li style=\"list-style-type: none\">\n<ul>\n<li data-ogsc=\"rgb(33, 33, 33)\">Full closures of eastbound <span data-ogsc=\"black\">South Academy Boulevard at I-25. Use detour route.<\/span><\/li>\n<\/ul>\n<\/li>\n<\/ul>\n<ul style=\"font-weight: 400\">\n<li data-ogsc=\"black\" data-ogsb=\"white\"><span data-ogsc=\"rgb(30, 30, 30)\">Friday, May 10, 8 p.m. <\/span><span data-ogsc=\"black\">to 9 a.m.<\/span><\/li>\n<\/ul>\n<ul style=\"font-weight: 400\">\n<li style=\"list-style-type: none\">\n<ul>\n<li data-ogsc=\"rgb(33, 33, 33)\">Re-route traffic on northbound I-25 using <span data-ogsc=\"black\">South Academy Boulevard ramps.<\/span><\/li>\n<\/ul>\n<\/li>\n<\/ul>\n<p> <\/p>\n<p style=\"font-weight: 400\"><strong>South Academy Boulevard Widening Project<\/strong><\/p>\n<ul style=\"font-weight: 400\">\n<li data-ogsc=\"rgb(33, 33, 33)\"><span data-ogsc=\"black\">Sunday, May 5, 12 a.m. through Thursday, May 8, 5 p.m. | <\/span><span data-ogsc=\"black\">Northbound US 85\/87 right lane closure under South Academy <\/span>Boulevard.<\/li>\n<\/ul>\n<ul style=\"font-weight: 400\">\n<li style=\"list-style-type: none\"><\/li>\n<\/ul>\n<ul style=\"font-weight: 400\">\n<li data-ogsc=\"rgb(33, 33, 33)\">Thursday, May 9, 12 p.m. throug<span data-ogsc=\"black\">h May 23<\/span><span data-ogsc=\"black\">, 5 p.m. | <\/span><span data-ogsc=\"black\">Southbound South Academy <\/span>Boulevard<span data-ogsc=\"black\"> off-ramp to US 85\/87 lane shift.<\/span><\/li>\n<li data-ogsc=\"rgb(33, 33, 33)\">Ongoing full closure of existing northbound South Academy Boulevard on-ramp from US 85\/87 and shift to temporary on-ramp, in place for approx. 5-6 months<\/li>\n<\/ul>\n<ul style=\"font-weight: 400\">\n<li style=\"list-style-type: none\"><\/li>\n<\/ul>\n<ul style=\"font-weight: 400\">\n<li data-ogsc=\"rgb(33, 33, 33)\"><span data-ogsc=\"windowtext\">Ongoing<\/span><span data-ogsc=\"black\"> northbound and southbound left lane closure at South Academy Boulevard over Bradley Road<\/span><\/li>\n<li data-ogsc=\"rgb(33, 33, 33)\"><span data-ogsc=\"black\">Ongoing shift of all lanes on Bradley Road under South Academy Boulevard bridge<\/span><\/li>\n<li data-ogsc=\"rgb(33, 33, 33)\"><span data-ogsc=\"black\">Fountain Creek Regional Trail under South Academy Boulevard will permanently open on Wednesday, May 8.<\/span><\/li>\n<\/ul>\n<p style=\"font-weight: 400\"><strong>Project Overview<\/strong><\/p>\n<p style=\"font-weight: 400\"><strong>Interstate-25 \u2013 Safety and Efficiency Improvements <\/strong><\/p>\n<p style=\"font-weight: 400\"><span data-ogsc=\"black\">The improvements to I-25 addressed in this project are located along an approximately 7.5-mile segment of south I-25 beginning at <\/span><span data-ogsc=\"black\">South Academy Boulevard <\/span><span data-ogsc=\"black\">and extending to the Santa Fe Avenue (US 85\/87) exit at Fountain (MP 128), which exits to Gate 19 of Fort Carson. The project includes:<\/span><\/p>\n<ul style=\"font-weight: 400\">\n<li data-ogsc=\"black\">Replacement of two bridges crossing over South Academy Boulevard<\/li>\n<li data-ogsc=\"black\">Widening of both inside and outside shoulders and installing safety improvements<\/li>\n<li data-ogsc=\"black\">Concrete surface treatment overlay to provide an improved riding surface<\/li>\n<li data-ogsc=\"black\">Installation of median barrier<\/li>\n<li data-ogsc=\"black\">Rehab and widening work on four bridges<\/li>\n<li data-ogsc=\"black\">Installation of an I-25 southbound deceleration lane at the interchange with Colorado Highway 16<\/li>\n<\/ul>\n<p style=\"font-weight: 400\"><strong>\u00a0<\/strong><\/p>\n<p style=\"font-weight: 400\"><strong><span data-ogsc=\"black\">South Academy Boulevard Widening Project<\/span><\/strong><\/p>\n<p style=\"font-weight: 400\"><span data-ogsc=\"black\" data-ogsb=\"white\">The improvements to South Academy Boulevard in this project are located on South Academy Boulevard at the southern mile and a half of this arterial road from the I-25 interchange, crossing US 85\/87, and continuing to the road\u2019s approach to Milton Proby Parkway (which connects to Powers Boulevard\/CO 21). Construction focuses on widening an approximately 1.5-mile section of South Academy Boulevard from two lanes to three in each direction to alleviate recurring congestion. The project includes improved drainage facilities, lighting, striping, and expanded shoulders, modified merge lanes, sound walls and bridgework. The project is expected to be complete by early 2026. This project is managed by El Paso County.<\/span><\/p>\n<p style=\"font-weight: 400\"><strong>\u00a0<\/strong><\/p>\n<p style=\"font-weight: 400\"><strong>Safety Benefits<\/strong><\/p>\n<p style=\"font-weight: 400\"><span data-ogsc=\"black\">CDOT conducted a safety assessment for the corridor to evaluate the magnitude and nature of\u00a0safety problems and analyze the causes of crashes. These transportation improvements are mitigation measures to reduce crashes, improve infrastructure, and address physical deficiencies that contribute to crashes in the corridor. Over the next twenty years, the project is estimated to result in fewer deaths, injuries, and crashes on the four MAMSIP corridors.<\/span><\/p>\n<p style=\"font-weight: 400\"><strong>\u00a0<\/strong><\/p>\n<p style=\"font-weight: 400\"><strong>Project Contact Information<\/strong><\/p>\n<p style=\"font-weight: 400\"><span data-ogsc=\"black\">Website: <\/span><a href=\"https:\/\/url.us.m.mimecastprotect.com\/s\/2EWDC5yxV5cwLkPYFziqZv\" data-ogsc=\"\">https:\/\/www.codot.gov\/projects\/militaryaccesssafetyimprovements<\/a><\/p>\n<p style=\"font-weight: 400\"><span data-ogsc=\"black\">Email: <\/span><a href=\"mailto:I25CO94.mamsip@gmail.com\" data-ogsc=\"\">I25CO94.mamsip@gmail.com<\/a><\/p>\n<p style=\"font-weight: 400\"><span data-ogsc=\"black\">Hotline: 719-800-2162<\/span><\/p>\n<p style=\"font-weight: 400\"><span data-ogsc=\"black\">Register for Alerts: Text MAMSIP to 888-970-9665<\/span><\/p>\n<p>[\/vc_column_text][\/vc_column][\/vc_row]<\/p>\n<\/div>","protected":false},"excerpt":{"rendered":"<p>[vc_row][vc_column][vc_column_text css=&#8221;&#8221;] May 03, 2024- A northbound US 85\/87 right lane closure under the South Academy Boulevard bridge is scheduled on Sunday, May 5, 12 a.m. through Wednesday, May 8, 5 p.m. to allow crews to continue drainage pipe installation across the roadway. \u00a0 Also, a minor lane shift to a new alignment will begin&hellip;<\/p>\n","protected":false},"author":26,"featured_media":12075,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[1391,1673,23,24,27],"tags":[],"class_list":["post-14813","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-featured-news","category-news","category-public-works","category-roads","category-transportation","category-1391","category-1673","category-23","category-24","category-27","description-off"],"yoast_head":"<!-- This site is optimized with the Yoast SEO Premium plugin v27.2 (Yoast SEO v27.2) - https:\/\/yoast.com\/product\/yoast-seo-premium-wordpress\/ -->\n<title>Traffic Advisory \u2013 Week of May 05 Military Access, Mobility &amp; Safety Improvement Project - El Paso County Colorado<\/title>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/www.elpasoco.com\/traffic-advisory-week-of-may-05-military-access-mobility-safety-improvement-project\/\" \/>\n<meta property=\"og:locale\" content=\"en_US\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"Traffic Advisory \u2013 Week of May 05 Military Access, Mobility &amp; Safety Improvement Project\" \/>\n<meta property=\"og:description\" content=\"[vc_row][vc_column][vc_column_text css=&#8221;&#8221;] May 03, 2024- A northbound US 85\/87 right lane closure under the South Academy Boulevard bridge is scheduled on Sunday, May 5, 12 a.m. through Wednesday, May 8, 5 p.m. to allow crews to continue drainage pipe installation across the roadway. \u00a0 Also, a minor lane shift to a new alignment will begin&hellip;\" \/>\n<meta property=\"og:url\" content=\"https:\/\/www.elpasoco.com\/traffic-advisory-week-of-may-05-military-access-mobility-safety-improvement-project\/\" \/>\n<meta property=\"og:site_name\" content=\"El Paso County Colorado\" \/>\n<meta property=\"article:published_time\" content=\"2024-05-03T21:29:44+00:00\" \/>\n<meta property=\"article:modified_time\" content=\"2025-09-30T20:58:32+00:00\" \/>\n<meta property=\"og:image\" content=\"https:\/\/epc-assets.elpasoco.com\/wp-content\/uploads\/Night-Road-Work-Alert.png\" \/>\n\t<meta property=\"og:image:width\" content=\"600\" \/>\n\t<meta property=\"og:image:height\" content=\"600\" \/>\n\t<meta property=\"og:image:type\" content=\"image\/png\" \/>\n<meta name=\"author\" content=\"DeborahContreras@elpasoco.com\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<meta name=\"twitter:label1\" content=\"Written by\" \/>\n\t<meta name=\"twitter:data1\" content=\"DeborahContreras@elpasoco.com\" \/>\n\t<meta name=\"twitter:label2\" content=\"Est. reading time\" \/>\n\t<meta name=\"twitter:data2\" content=\"4 minutes\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\/\/schema.org\",\"@graph\":[{\"@type\":\"Article\",\"@id\":\"https:\/\/www.elpasoco.com\/traffic-advisory-week-of-may-05-military-access-mobility-safety-improvement-project\/#article\",\"isPartOf\":{\"@id\":\"https:\/\/www.elpasoco.com\/traffic-advisory-week-of-may-05-military-access-mobility-safety-improvement-project\/\"},\"author\":{\"name\":\"DeborahContreras@elpasoco.com\",\"@id\":\"https:\/\/www.elpasoco.com\/#\/schema\/person\/af0619040b0a1a6d6802f809083e3e75\"},\"headline\":\"Traffic Advisory \u2013 Week of May 05 Military Access, Mobility &amp; Safety Improvement Project\",\"datePublished\":\"2024-05-03T21:29:44+00:00\",\"dateModified\":\"2025-09-30T20:58:32+00:00\",\"mainEntityOfPage\":{\"@id\":\"https:\/\/www.elpasoco.com\/traffic-advisory-week-of-may-05-military-access-mobility-safety-improvement-project\/\"},\"wordCount\":820,\"image\":{\"@id\":\"https:\/\/www.elpasoco.com\/traffic-advisory-week-of-may-05-military-access-mobility-safety-improvement-project\/#primaryimage\"},\"thumbnailUrl\":\"https:\/\/epc-assets.elpasoco.com\/wp-content\/uploads\/Night-Road-Work-Alert.png\",\"articleSection\":[\"FEATURED NEWS\",\"NEWS\",\"Public Works\",\"Roads\",\"Transportation\"],\"inLanguage\":\"en-US\"},{\"@type\":\"WebPage\",\"@id\":\"https:\/\/www.elpasoco.com\/traffic-advisory-week-of-may-05-military-access-mobility-safety-improvement-project\/\",\"url\":\"https:\/\/www.elpasoco.com\/traffic-advisory-week-of-may-05-military-access-mobility-safety-improvement-project\/\",\"name\":\"Traffic Advisory \u2013 Week of May 05 Military Access, Mobility &amp; Safety Improvement Project - El Paso County Colorado\",\"isPartOf\":{\"@id\":\"https:\/\/www.elpasoco.com\/#website\"},\"primaryImageOfPage\":{\"@id\":\"https:\/\/www.elpasoco.com\/traffic-advisory-week-of-may-05-military-access-mobility-safety-improvement-project\/#primaryimage\"},\"image\":{\"@id\":\"https:\/\/www.elpasoco.com\/traffic-advisory-week-of-may-05-military-access-mobility-safety-improvement-project\/#primaryimage\"},\"thumbnailUrl\":\"https:\/\/epc-assets.elpasoco.com\/wp-content\/uploads\/Night-Road-Work-Alert.png\",\"datePublished\":\"2024-05-03T21:29:44+00:00\",\"dateModified\":\"2025-09-30T20:58:32+00:00\",\"author\":{\"@id\":\"https:\/\/www.elpasoco.com\/#\/schema\/person\/af0619040b0a1a6d6802f809083e3e75\"},\"breadcrumb\":{\"@id\":\"https:\/\/www.elpasoco.com\/traffic-advisory-week-of-may-05-military-access-mobility-safety-improvement-project\/#breadcrumb\"},\"inLanguage\":\"en-US\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\/\/www.elpasoco.com\/traffic-advisory-week-of-may-05-military-access-mobility-safety-improvement-project\/\"]}]},{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\/\/www.elpasoco.com\/traffic-advisory-week-of-may-05-military-access-mobility-safety-improvement-project\/#primaryimage\",\"url\":\"https:\/\/epc-assets.elpasoco.com\/wp-content\/uploads\/Night-Road-Work-Alert.png\",\"contentUrl\":\"https:\/\/epc-assets.elpasoco.com\/wp-content\/uploads\/Night-Road-Work-Alert.png\",\"width\":600,\"height\":600,\"caption\":\"An image of a road cross light with text that reads road work alert. News release\"},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\/\/www.elpasoco.com\/traffic-advisory-week-of-may-05-military-access-mobility-safety-improvement-project\/#breadcrumb\",\"itemListElement\":[{\"@type\":\"ListItem\",\"position\":1,\"name\":\"Home\",\"item\":\"https:\/\/www.elpasoco.com\/\"},{\"@type\":\"ListItem\",\"position\":2,\"name\":\"Traffic Advisory \u2013 Week of May 05 Military Access, Mobility &amp; Safety Improvement Project\"}]},{\"@type\":\"WebSite\",\"@id\":\"https:\/\/www.elpasoco.com\/#website\",\"url\":\"https:\/\/www.elpasoco.com\/\",\"name\":\"El Paso County Colorado\",\"description\":\"\",\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"https:\/\/www.elpasoco.com\/?s={search_term_string}\"},\"query-input\":{\"@type\":\"PropertyValueSpecification\",\"valueRequired\":true,\"valueName\":\"search_term_string\"}}],\"inLanguage\":\"en-US\"},{\"@type\":\"Person\",\"@id\":\"https:\/\/www.elpasoco.com\/#\/schema\/person\/af0619040b0a1a6d6802f809083e3e75\",\"name\":\"DeborahContreras@elpasoco.com\",\"image\":{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\/\/secure.gravatar.com\/avatar\/7aba09696bf435293dad517cc9fb7b98e67a8184b99a1c0e0b4981612fff4b87?s=96&d=mm&r=g\",\"url\":\"https:\/\/secure.gravatar.com\/avatar\/7aba09696bf435293dad517cc9fb7b98e67a8184b99a1c0e0b4981612fff4b87?s=96&d=mm&r=g\",\"contentUrl\":\"https:\/\/secure.gravatar.com\/avatar\/7aba09696bf435293dad517cc9fb7b98e67a8184b99a1c0e0b4981612fff4b87?s=96&d=mm&r=g\",\"caption\":\"DeborahContreras@elpasoco.com\"}}]}<\/script>\n<!-- \/ Yoast SEO Premium plugin. -->","yoast_head_json":{"title":"Traffic Advisory \u2013 Week of May 05 Military Access, Mobility &amp; Safety Improvement Project - El Paso County Colorado","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/www.elpasoco.com\/traffic-advisory-week-of-may-05-military-access-mobility-safety-improvement-project\/","og_locale":"en_US","og_type":"article","og_title":"Traffic Advisory \u2013 Week of May 05 Military Access, Mobility &amp; Safety Improvement Project","og_description":"[vc_row][vc_column][vc_column_text css=&#8221;&#8221;] May 03, 2024- A northbound US 85\/87 right lane closure under the South Academy Boulevard bridge is scheduled on Sunday, May 5, 12 a.m. through Wednesday, May 8, 5 p.m. to allow crews to continue drainage pipe installation across the roadway. \u00a0 Also, a minor lane shift to a new alignment will begin&hellip;","og_url":"https:\/\/www.elpasoco.com\/traffic-advisory-week-of-may-05-military-access-mobility-safety-improvement-project\/","og_site_name":"El Paso County Colorado","article_published_time":"2024-05-03T21:29:44+00:00","article_modified_time":"2025-09-30T20:58:32+00:00","og_image":[{"width":600,"height":600,"url":"https:\/\/epc-assets.elpasoco.com\/wp-content\/uploads\/Night-Road-Work-Alert.png","type":"image\/png"}],"author":"DeborahContreras@elpasoco.com","twitter_card":"summary_large_image","twitter_misc":{"Written by":"DeborahContreras@elpasoco.com","Est. reading time":"4 minutes"},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"Article","@id":"https:\/\/www.elpasoco.com\/traffic-advisory-week-of-may-05-military-access-mobility-safety-improvement-project\/#article","isPartOf":{"@id":"https:\/\/www.elpasoco.com\/traffic-advisory-week-of-may-05-military-access-mobility-safety-improvement-project\/"},"author":{"name":"DeborahContreras@elpasoco.com","@id":"https:\/\/www.elpasoco.com\/#\/schema\/person\/af0619040b0a1a6d6802f809083e3e75"},"headline":"Traffic Advisory \u2013 Week of May 05 Military Access, Mobility &amp; Safety Improvement Project","datePublished":"2024-05-03T21:29:44+00:00","dateModified":"2025-09-30T20:58:32+00:00","mainEntityOfPage":{"@id":"https:\/\/www.elpasoco.com\/traffic-advisory-week-of-may-05-military-access-mobility-safety-improvement-project\/"},"wordCount":820,"image":{"@id":"https:\/\/www.elpasoco.com\/traffic-advisory-week-of-may-05-military-access-mobility-safety-improvement-project\/#primaryimage"},"thumbnailUrl":"https:\/\/epc-assets.elpasoco.com\/wp-content\/uploads\/Night-Road-Work-Alert.png","articleSection":["FEATURED NEWS","NEWS","Public Works","Roads","Transportation"],"inLanguage":"en-US"},{"@type":"WebPage","@id":"https:\/\/www.elpasoco.com\/traffic-advisory-week-of-may-05-military-access-mobility-safety-improvement-project\/","url":"https:\/\/www.elpasoco.com\/traffic-advisory-week-of-may-05-military-access-mobility-safety-improvement-project\/","name":"Traffic Advisory \u2013 Week of May 05 Military Access, Mobility &amp; Safety Improvement Project - El Paso County Colorado","isPartOf":{"@id":"https:\/\/www.elpasoco.com\/#website"},"primaryImageOfPage":{"@id":"https:\/\/www.elpasoco.com\/traffic-advisory-week-of-may-05-military-access-mobility-safety-improvement-project\/#primaryimage"},"image":{"@id":"https:\/\/www.elpasoco.com\/traffic-advisory-week-of-may-05-military-access-mobility-safety-improvement-project\/#primaryimage"},"thumbnailUrl":"https:\/\/epc-assets.elpasoco.com\/wp-content\/uploads\/Night-Road-Work-Alert.png","datePublished":"2024-05-03T21:29:44+00:00","dateModified":"2025-09-30T20:58:32+00:00","author":{"@id":"https:\/\/www.elpasoco.com\/#\/schema\/person\/af0619040b0a1a6d6802f809083e3e75"},"breadcrumb":{"@id":"https:\/\/www.elpasoco.com\/traffic-advisory-week-of-may-05-military-access-mobility-safety-improvement-project\/#breadcrumb"},"inLanguage":"en-US","potentialAction":[{"@type":"ReadAction","target":["https:\/\/www.elpasoco.com\/traffic-advisory-week-of-may-05-military-access-mobility-safety-improvement-project\/"]}]},{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/www.elpasoco.com\/traffic-advisory-week-of-may-05-military-access-mobility-safety-improvement-project\/#primaryimage","url":"https:\/\/epc-assets.elpasoco.com\/wp-content\/uploads\/Night-Road-Work-Alert.png","contentUrl":"https:\/\/epc-assets.elpasoco.com\/wp-content\/uploads\/Night-Road-Work-Alert.png","width":600,"height":600,"caption":"An image of a road cross light with text that reads road work alert. News release"},{"@type":"BreadcrumbList","@id":"https:\/\/www.elpasoco.com\/traffic-advisory-week-of-may-05-military-access-mobility-safety-improvement-project\/#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"Home","item":"https:\/\/www.elpasoco.com\/"},{"@type":"ListItem","position":2,"name":"Traffic Advisory \u2013 Week of May 05 Military Access, Mobility &amp; Safety Improvement Project"}]},{"@type":"WebSite","@id":"https:\/\/www.elpasoco.com\/#website","url":"https:\/\/www.elpasoco.com\/","name":"El Paso County Colorado","description":"","potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/www.elpasoco.com\/?s={search_term_string}"},"query-input":{"@type":"PropertyValueSpecification","valueRequired":true,"valueName":"search_term_string"}}],"inLanguage":"en-US"},{"@type":"Person","@id":"https:\/\/www.elpasoco.com\/#\/schema\/person\/af0619040b0a1a6d6802f809083e3e75","name":"DeborahContreras@elpasoco.com","image":{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/secure.gravatar.com\/avatar\/7aba09696bf435293dad517cc9fb7b98e67a8184b99a1c0e0b4981612fff4b87?s=96&d=mm&r=g","url":"https:\/\/secure.gravatar.com\/avatar\/7aba09696bf435293dad517cc9fb7b98e67a8184b99a1c0e0b4981612fff4b87?s=96&d=mm&r=g","contentUrl":"https:\/\/secure.gravatar.com\/avatar\/7aba09696bf435293dad517cc9fb7b98e67a8184b99a1c0e0b4981612fff4b87?s=96&d=mm&r=g","caption":"DeborahContreras@elpasoco.com"}}]}},"publishpress_future_action":{"enabled":false,"date":"2026-05-10 22:06:03","action":"change-status","newStatus":"draft","terms":[],"taxonomy":"category","extraData":[]},"publishpress_future_workflow_manual_trigger":{"enabledWorkflows":[]},"_links":{"self":[{"href":"https:\/\/www.elpasoco.com\/wp-json\/wp\/v2\/posts\/14813","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.elpasoco.com\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.elpasoco.com\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.elpasoco.com\/wp-json\/wp\/v2\/users\/26"}],"replies":[{"embeddable":true,"href":"https:\/\/www.elpasoco.com\/wp-json\/wp\/v2\/comments?post=14813"}],"version-history":[{"count":4,"href":"https:\/\/www.elpasoco.com\/wp-json\/wp\/v2\/posts\/14813\/revisions"}],"predecessor-version":[{"id":19026,"href":"https:\/\/www.elpasoco.com\/wp-json\/wp\/v2\/posts\/14813\/revisions\/19026"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.elpasoco.com\/wp-json\/wp\/v2\/media\/12075"}],"wp:attachment":[{"href":"https:\/\/www.elpasoco.com\/wp-json\/wp\/v2\/media?parent=14813"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.elpasoco.com\/wp-json\/wp\/v2\/categories?post=14813"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.elpasoco.com\/wp-json\/wp\/v2\/tags?post=14813"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}