{"id":14797,"date":"2024-04-28T18:05:23","date_gmt":"2024-04-29T00:05:23","guid":{"rendered":"https:\/\/www.elpasoco.com\/?p=14797"},"modified":"2024-04-28T18:05:23","modified_gmt":"2024-04-29T00:05:23","slug":"traffic-advisory-week-of-april-29-military-access-mobility-safety-improvement-project","status":"publish","type":"post","link":"https:\/\/www.elpasoco.com\/traffic-advisory-week-of-april-29-military-access-mobility-safety-improvement-project\/","title":{"rendered":"Traffic Advisory \u2013 Week of April 29 Military Access, Mobility &amp; Safety Improvement Project"},"content":{"rendered":"<div class=\"wpb-content-wrapper\"><p>[vc_row][vc_column][vc_column_text css=&#8221;&#8221;]<\/p>\n<p style=\"font-weight: 400\"><span data-ogsc=\"black\"><strong>April 28, 2024-<\/strong> North- and southbound US 85\/87 will be reduced to one lane each direction under the South Academy bridge <\/span><span data-ogsc=\"rgb(30, 30, 30)\">from\u00a0<\/span><span data-ogsc=\"black\">Monday, April 29 at 9 a.m. through Friday, May 3 at 4:30 a.m. to allow crews to install drainage pipe across the roadway. Motorists are urged to use caution traveling through the area.<\/span><\/p>\n<p style=\"font-weight: 400\"><span data-ogsc=\"black\">\u00a0<\/span><\/p>\n<p style=\"font-weight: 400\"><span data-ogsc=\"rgb(30, 30, 30)\">Also, on Thursday<\/span><span data-ogsc=\"black\">, May 2, 7 p.m. through Friday, May 3, 4:30 a.m., there will be north- and southbound US 85\/87 alternating lane closures under the South Academy Boulevard bridge to allow crews to place lane striping for a temporary new configuration which will consist of a single lane closure in both the north- and southbound directions to continue drainage work.<\/span><\/p>\n<p style=\"font-weight: 400\" data-ogsb=\"white\"><span data-ogsc=\"black\">A<strong>\u00a0<\/strong><strong>shift to a temporary on-ramp<\/strong>\u00a0for drivers entering northbound South Academy Boulevard from US 85\/87 is ongoing as crews will perform work on roadway, drainage and utilities in the area. The ramp lane width will be reduced to 12 feet, and speeds will be reduced to 30 MPH. This closure will be in effect approximately 5-6 months.<\/span><\/p>\n<p style=\"font-weight: 400\"><strong><span data-ogsc=\"black\">Motorists are advised to use caution at all entrance ramps as merge lengths have been shortened.\u00a0<\/span><\/strong><span data-ogsc=\"black\">In particular, motorists should be prepared to stop on the\u00a0<strong>US 85\/87 on-ramp to eastbound South Academy<\/strong>\u00a0and the Bradley Road on-ramp to eastbound South Academy since merge area is greatly reduced. Work crews are installing signage and flashing beacons to alert traffic to the reduced merge lengths.<\/span><\/p>\n<p style=\"font-weight: 400\"><span data-ogsc=\"black\">All lanes of Bradley Road under South Academy Boulevard will be shifted to the center of the roadway ongoing to allow crews to perform work on new bridge piers.<\/span><\/p>\n<p style=\"font-weight: 400\"><span data-ogsc=\"black\">\u00a0<\/span><\/p>\n<p style=\"font-weight: 400\"><span data-ogsc=\"black\">A left lane closure is ongoing for northbound and southbound South Academy Boulevard over Bradley Road to allow crews to perform bridge work.<\/span><\/p>\n<p style=\"font-weight: 400\"><span data-ogsc=\"black\">\u00a0<\/span><\/p>\n<p style=\"font-weight: 400\"><span data-ogsc=\"black\">These closures are weather dependent and subject to change.<\/span><\/p>\n<p style=\"font-weight: 400\"><span data-ogsc=\"black\">\u00a0<\/span><span data-ogsc=\"black\">\u00a0<\/span><\/p>\n<p style=\"font-weight: 400\" data-ogsb=\"white\"><strong>Traffic Impacts<\/strong><\/p>\n<p style=\"font-weight: 400\"><strong><span data-ogsc=\"black\">I-25 between US 85\/Fountain (MP 127) and South Academy Boulevard (MP 135)<\/span><\/strong><\/p>\n<ul style=\"font-weight: 400\">\n<li data-ogsc=\"black\" data-ogsb=\"white\"><span data-ogsc=\"rgb(30, 30, 30)\">Friday, May 3, 7 p.m.\u00a0<\/span>to 5:30 a.m.\n<ul>\n<li data-ogsc=\"rgb(33, 33, 33)\">Full closures of westbound\u00a0<span data-ogsc=\"black\">South Academy Boulevard at I-25. Use detour route.<\/span><\/li>\n<\/ul>\n<\/li>\n<li data-ogsc=\"black\" data-ogsb=\"white\"><span data-ogsc=\"rgb(30, 30, 30)\">Friday, May 3, 8 p.m.\u00a0<\/span>to 7:30 a.m.\n<ul>\n<li data-ogsc=\"rgb(33, 33, 33)\">Full closures of eastbound\u00a0<span data-ogsc=\"black\">South Academy Boulevard at I-25. Use detour route.<\/span><\/li>\n<\/ul>\n<\/li>\n<li data-ogsc=\"black\" data-ogsb=\"white\"><span data-ogsc=\"rgb(30, 30, 30)\">Friday, May 3, 8 p.m.\u00a0<\/span>&#8211; 9 a.m.\n<ul>\n<li data-ogsc=\"rgb(33, 33, 33)\">Re-route traffic on northbound I-25 using\u00a0<span data-ogsc=\"black\">South Academy Boulevard ramps.<\/span><\/li>\n<\/ul>\n<\/li>\n<\/ul>\n<p style=\"font-weight: 400\"><strong><span data-ogsc=\"black\">South Academy Boulevard Widening Project<\/span><\/strong><\/p>\n<ul style=\"font-weight: 400\">\n<li data-ogsc=\"rgb(33, 33, 33)\">Monday, April 29, 9 a.m. through\u00a0<span data-ogsc=\"black\">Friday, May 3, 4:30 a.m.<\/span><\/li>\n<\/ul>\n<p style=\"font-weight: 400\"><span data-ogsc=\"rgb(33, 33, 33)\">o\u00a0\u00a0\u00a0 <\/span><span data-ogsc=\"rgb(33, 33, 33)\">North- and southbound US 85\/87 reduced to one lane each direction under South Academy Boulevard.<\/span><\/p>\n<ul style=\"font-weight: 400\">\n<li data-ogsc=\"rgb(33, 33, 33)\"><span data-ogsc=\"rgb(30, 30, 30)\">Thursday<\/span><span data-ogsc=\"black\">, May 2, 7 p.m. through Friday, May 3, 4:30 a.m.<\/span><\/li>\n<\/ul>\n<p style=\"font-weight: 400\"><span data-ogsc=\"rgb(33, 33, 33)\">o\u00a0\u00a0\u00a0 <\/span><span data-ogsc=\"black\">North- and southbound US 85\/87 alternating lane closures under South Academy\u00a0<\/span><span data-ogsc=\"rgb(33, 33, 33)\">Boulevard.<\/span><\/p>\n<ul style=\"font-weight: 400\">\n<li data-ogsc=\"black\"><span data-ogsc=\"rgb(33, 33, 33)\">Ongoing full closure of existing northbound South Academy Boulevard on-ramp from US 85\/87 and shift to temporary on-ramp, in place for approx. 5-6 months<\/span><\/li>\n<li data-ogsc=\"black\"><span data-ogsc=\"windowtext\">Ongoing<\/span>\u00a0northbound and southbound left lane closure at South Academy Boulevard over Bradley Road<\/li>\n<li data-ogsc=\"black\">Ongoing shift of all lanes on Bradley Road under South Academy Boulevard bridge<\/li>\n<li data-ogsc=\"black\"><span data-ogsc=\"windowtext\">Ongoing closure of\u00a0<\/span>the Fountain Creek Regional Trail under South Academy Boulevard<\/li>\n<\/ul>\n<p style=\"font-weight: 400\"><span data-ogsc=\"black\">\u00a0<\/span><\/p>\n<p style=\"font-weight: 400\"><strong>Project Overview<\/strong><\/p>\n<p style=\"font-weight: 400\"><strong><span data-ogsc=\"black\">Interstate-25 \u2013 Safety and Efficiency Improvements\u00a0<\/span><\/strong><\/p>\n<p style=\"font-weight: 400\"><span data-ogsc=\"black\">The improvements to I-25 addressed in this project are located along an approximately 7.5-mile segment of south I-25 beginning at South Academy Boulevard and extending to the Santa Fe Avenue (US 85\/87) exit at Fountain (MP 128), which exits to Gate 19 of Fort Carson. The project includes:<\/span><\/p>\n<ul style=\"font-weight: 400\">\n<li data-ogsc=\"black\">Replacement of two bridges crossing over South Academy Boulevard<\/li>\n<li data-ogsc=\"black\">Widening of both inside and outside shoulders and installing safety improvements<\/li>\n<li data-ogsc=\"black\">Concrete surface treatment overlay to provide an improved riding surface<\/li>\n<li data-ogsc=\"black\">Installation of median barrier<\/li>\n<li data-ogsc=\"black\">Rehab and widening work on four bridges<\/li>\n<li data-ogsc=\"black\">Installation of an I-25 southbound deceleration lane at the interchange with Colorado Highway 16<\/li>\n<\/ul>\n<p style=\"font-weight: 400\"><strong>\u00a0<\/strong><\/p>\n<p style=\"font-weight: 400\"><strong><span data-ogsc=\"black\">South Academy Boulevard Widening Project<\/span><\/strong><\/p>\n<p style=\"font-weight: 400\"><span data-ogsc=\"black\" data-ogsb=\"white\">The improvements to South Academy Boulevard in this project are located on South Academy Boulevard at the southern mile and a half of this arterial road from the I-25 interchange, crossing US 85\/87, and continuing to the road\u2019s approach to Milton Proby Parkway (which connects to Powers Boulevard\/CO 21). Construction focuses on widening an approximately 1.5-mile section of South Academy Boulevard from two lanes to three in each direction to alleviate recurring congestion. The project includes improved drainage facilities, lighting, striping, and expanded shoulders, modified merge lanes, sound walls and bridgework. The project is expected to be complete by early 2026. This project is managed by El Paso County.<\/span><\/p>\n<p style=\"font-weight: 400\"><strong>\u00a0<\/strong><\/p>\n<p style=\"font-weight: 400\"><strong>Safety Benefits<\/strong><\/p>\n<p style=\"font-weight: 400\"><span data-ogsc=\"black\">CDOT conducted a safety assessment for the corridor to evaluate the magnitude and nature of\u00a0safety problems and analyze the causes of crashes. These transportation improvements are mitigation measures to reduce crashes, improve infrastructure, and address physical deficiencies that contribute to crashes in the corridor. Over the next twenty years, the project is estimated to result in fewer deaths, injuries, and crashes on the four MAMSIP corridors.<\/span><\/p>\n<p style=\"font-weight: 400\"><strong>\u00a0<\/strong><\/p>\n<p style=\"font-weight: 400\"><strong>Project Contact Information<\/strong><\/p>\n<p style=\"font-weight: 400\"><span data-ogsc=\"black\">Website:\u00a0<a href=\"https:\/\/url.us.m.mimecastprotect.com\/s\/89pfC4xwV7HRgL73SOL3Hi\" data-ogsc=\"\">https:\/\/www.codot.gov\/projects\/militaryaccesssafetyimprovements<\/a><\/span><\/p>\n<p style=\"font-weight: 400\"><span data-ogsc=\"black\">Email:\u00a0<\/span><span data-ogsc=\"black\"><a href=\"mailto:I25CO94.mamsip@gmail.com\" data-ogsc=\"\">I25CO94.mamsip@gmail.com<\/a><\/span><\/p>\n<p style=\"font-weight: 400\"><span data-ogsc=\"black\">Hotline: 719-800-2162<\/span><\/p>\n<p style=\"font-weight: 400\"><span data-ogsc=\"black\">Register for Alerts: Text MAMSIP to 888-970-9665<\/span><\/p>\n<p>[\/vc_column_text][\/vc_column][\/vc_row]<\/p>\n<\/div>","protected":false},"excerpt":{"rendered":"<p>[vc_row][vc_column][vc_column_text css=&#8221;&#8221;] April 28, 2024- North- and southbound US 85\/87 will be reduced to one lane each direction under the South Academy bridge from\u00a0Monday, April 29 at 9 a.m. through Friday, May 3 at 4:30 a.m. to allow crews to install drainage pipe across the roadway. Motorists are urged to use caution traveling through the&hellip;<\/p>\n","protected":false},"author":26,"featured_media":12068,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[1391,1673,23,24,27],"tags":[],"class_list":["post-14797","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-featured-news","category-news","category-public-works","category-roads","category-transportation","category-1391","category-1673","category-23","category-24","category-27","description-off"],"yoast_head":"<!-- This site is optimized with the Yoast SEO Premium plugin v27.2 (Yoast SEO v27.2) - https:\/\/yoast.com\/product\/yoast-seo-premium-wordpress\/ -->\n<title>Traffic Advisory \u2013 Week of April 29 Military Access, Mobility &amp; Safety Improvement Project - El Paso County Colorado<\/title>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/www.elpasoco.com\/traffic-advisory-week-of-april-29-military-access-mobility-safety-improvement-project\/\" \/>\n<meta property=\"og:locale\" content=\"en_US\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"Traffic Advisory \u2013 Week of April 29 Military Access, Mobility &amp; Safety Improvement Project\" \/>\n<meta property=\"og:description\" content=\"[vc_row][vc_column][vc_column_text css=&#8221;&#8221;] April 28, 2024- North- and southbound US 85\/87 will be reduced to one lane each direction under the South Academy bridge from\u00a0Monday, April 29 at 9 a.m. through Friday, May 3 at 4:30 a.m. to allow crews to install drainage pipe across the roadway. Motorists are urged to use caution traveling through the&hellip;\" \/>\n<meta property=\"og:url\" content=\"https:\/\/www.elpasoco.com\/traffic-advisory-week-of-april-29-military-access-mobility-safety-improvement-project\/\" \/>\n<meta property=\"og:site_name\" content=\"El Paso County Colorado\" \/>\n<meta property=\"article:published_time\" content=\"2024-04-29T00:05:23+00:00\" \/>\n<meta property=\"og:image\" content=\"https:\/\/epc-assets.elpasoco.com\/wp-content\/uploads\/Road-Work-Alert-3.png\" \/>\n\t<meta property=\"og:image:width\" content=\"600\" \/>\n\t<meta property=\"og:image:height\" content=\"600\" \/>\n\t<meta property=\"og:image:type\" content=\"image\/png\" \/>\n<meta name=\"author\" content=\"DeborahContreras@elpasoco.com\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<meta name=\"twitter:label1\" content=\"Written by\" \/>\n\t<meta name=\"twitter:data1\" content=\"DeborahContreras@elpasoco.com\" \/>\n\t<meta name=\"twitter:label2\" content=\"Est. reading time\" \/>\n\t<meta name=\"twitter:data2\" content=\"4 minutes\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\/\/schema.org\",\"@graph\":[{\"@type\":\"Article\",\"@id\":\"https:\/\/www.elpasoco.com\/traffic-advisory-week-of-april-29-military-access-mobility-safety-improvement-project\/#article\",\"isPartOf\":{\"@id\":\"https:\/\/www.elpasoco.com\/traffic-advisory-week-of-april-29-military-access-mobility-safety-improvement-project\/\"},\"author\":{\"name\":\"DeborahContreras@elpasoco.com\",\"@id\":\"https:\/\/www.elpasoco.com\/#\/schema\/person\/af0619040b0a1a6d6802f809083e3e75\"},\"headline\":\"Traffic Advisory \u2013 Week of April 29 Military Access, Mobility &amp; Safety Improvement Project\",\"datePublished\":\"2024-04-29T00:05:23+00:00\",\"mainEntityOfPage\":{\"@id\":\"https:\/\/www.elpasoco.com\/traffic-advisory-week-of-april-29-military-access-mobility-safety-improvement-project\/\"},\"wordCount\":809,\"image\":{\"@id\":\"https:\/\/www.elpasoco.com\/traffic-advisory-week-of-april-29-military-access-mobility-safety-improvement-project\/#primaryimage\"},\"thumbnailUrl\":\"https:\/\/epc-assets.elpasoco.com\/wp-content\/uploads\/Road-Work-Alert-3.png\",\"articleSection\":[\"FEATURED NEWS\",\"NEWS\",\"Public Works\",\"Roads\",\"Transportation\"],\"inLanguage\":\"en-US\"},{\"@type\":\"WebPage\",\"@id\":\"https:\/\/www.elpasoco.com\/traffic-advisory-week-of-april-29-military-access-mobility-safety-improvement-project\/\",\"url\":\"https:\/\/www.elpasoco.com\/traffic-advisory-week-of-april-29-military-access-mobility-safety-improvement-project\/\",\"name\":\"Traffic Advisory \u2013 Week of April 29 Military Access, Mobility &amp; Safety Improvement Project - El Paso County Colorado\",\"isPartOf\":{\"@id\":\"https:\/\/www.elpasoco.com\/#website\"},\"primaryImageOfPage\":{\"@id\":\"https:\/\/www.elpasoco.com\/traffic-advisory-week-of-april-29-military-access-mobility-safety-improvement-project\/#primaryimage\"},\"image\":{\"@id\":\"https:\/\/www.elpasoco.com\/traffic-advisory-week-of-april-29-military-access-mobility-safety-improvement-project\/#primaryimage\"},\"thumbnailUrl\":\"https:\/\/epc-assets.elpasoco.com\/wp-content\/uploads\/Road-Work-Alert-3.png\",\"datePublished\":\"2024-04-29T00:05:23+00:00\",\"author\":{\"@id\":\"https:\/\/www.elpasoco.com\/#\/schema\/person\/af0619040b0a1a6d6802f809083e3e75\"},\"breadcrumb\":{\"@id\":\"https:\/\/www.elpasoco.com\/traffic-advisory-week-of-april-29-military-access-mobility-safety-improvement-project\/#breadcrumb\"},\"inLanguage\":\"en-US\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\/\/www.elpasoco.com\/traffic-advisory-week-of-april-29-military-access-mobility-safety-improvement-project\/\"]}]},{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\/\/www.elpasoco.com\/traffic-advisory-week-of-april-29-military-access-mobility-safety-improvement-project\/#primaryimage\",\"url\":\"https:\/\/epc-assets.elpasoco.com\/wp-content\/uploads\/Road-Work-Alert-3.png\",\"contentUrl\":\"https:\/\/epc-assets.elpasoco.com\/wp-content\/uploads\/Road-Work-Alert-3.png\",\"width\":600,\"height\":600,\"caption\":\"A image of an empty road with text that reads road work alert. News release\"},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\/\/www.elpasoco.com\/traffic-advisory-week-of-april-29-military-access-mobility-safety-improvement-project\/#breadcrumb\",\"itemListElement\":[{\"@type\":\"ListItem\",\"position\":1,\"name\":\"Home\",\"item\":\"https:\/\/www.elpasoco.com\/\"},{\"@type\":\"ListItem\",\"position\":2,\"name\":\"Traffic Advisory \u2013 Week of April 29 Military Access, Mobility &amp; Safety Improvement Project\"}]},{\"@type\":\"WebSite\",\"@id\":\"https:\/\/www.elpasoco.com\/#website\",\"url\":\"https:\/\/www.elpasoco.com\/\",\"name\":\"El Paso County Colorado\",\"description\":\"\",\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"https:\/\/www.elpasoco.com\/?s={search_term_string}\"},\"query-input\":{\"@type\":\"PropertyValueSpecification\",\"valueRequired\":true,\"valueName\":\"search_term_string\"}}],\"inLanguage\":\"en-US\"},{\"@type\":\"Person\",\"@id\":\"https:\/\/www.elpasoco.com\/#\/schema\/person\/af0619040b0a1a6d6802f809083e3e75\",\"name\":\"DeborahContreras@elpasoco.com\",\"image\":{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\/\/secure.gravatar.com\/avatar\/7aba09696bf435293dad517cc9fb7b98e67a8184b99a1c0e0b4981612fff4b87?s=96&d=mm&r=g\",\"url\":\"https:\/\/secure.gravatar.com\/avatar\/7aba09696bf435293dad517cc9fb7b98e67a8184b99a1c0e0b4981612fff4b87?s=96&d=mm&r=g\",\"contentUrl\":\"https:\/\/secure.gravatar.com\/avatar\/7aba09696bf435293dad517cc9fb7b98e67a8184b99a1c0e0b4981612fff4b87?s=96&d=mm&r=g\",\"caption\":\"DeborahContreras@elpasoco.com\"}}]}<\/script>\n<!-- \/ Yoast SEO Premium plugin. -->","yoast_head_json":{"title":"Traffic Advisory \u2013 Week of April 29 Military Access, Mobility &amp; Safety Improvement Project - El Paso County Colorado","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/www.elpasoco.com\/traffic-advisory-week-of-april-29-military-access-mobility-safety-improvement-project\/","og_locale":"en_US","og_type":"article","og_title":"Traffic Advisory \u2013 Week of April 29 Military Access, Mobility &amp; Safety Improvement Project","og_description":"[vc_row][vc_column][vc_column_text css=&#8221;&#8221;] April 28, 2024- North- and southbound US 85\/87 will be reduced to one lane each direction under the South Academy bridge from\u00a0Monday, April 29 at 9 a.m. through Friday, May 3 at 4:30 a.m. to allow crews to install drainage pipe across the roadway. Motorists are urged to use caution traveling through the&hellip;","og_url":"https:\/\/www.elpasoco.com\/traffic-advisory-week-of-april-29-military-access-mobility-safety-improvement-project\/","og_site_name":"El Paso County Colorado","article_published_time":"2024-04-29T00:05:23+00:00","og_image":[{"width":600,"height":600,"url":"https:\/\/epc-assets.elpasoco.com\/wp-content\/uploads\/Road-Work-Alert-3.png","type":"image\/png"}],"author":"DeborahContreras@elpasoco.com","twitter_card":"summary_large_image","twitter_misc":{"Written by":"DeborahContreras@elpasoco.com","Est. reading time":"4 minutes"},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"Article","@id":"https:\/\/www.elpasoco.com\/traffic-advisory-week-of-april-29-military-access-mobility-safety-improvement-project\/#article","isPartOf":{"@id":"https:\/\/www.elpasoco.com\/traffic-advisory-week-of-april-29-military-access-mobility-safety-improvement-project\/"},"author":{"name":"DeborahContreras@elpasoco.com","@id":"https:\/\/www.elpasoco.com\/#\/schema\/person\/af0619040b0a1a6d6802f809083e3e75"},"headline":"Traffic Advisory \u2013 Week of April 29 Military Access, Mobility &amp; Safety Improvement Project","datePublished":"2024-04-29T00:05:23+00:00","mainEntityOfPage":{"@id":"https:\/\/www.elpasoco.com\/traffic-advisory-week-of-april-29-military-access-mobility-safety-improvement-project\/"},"wordCount":809,"image":{"@id":"https:\/\/www.elpasoco.com\/traffic-advisory-week-of-april-29-military-access-mobility-safety-improvement-project\/#primaryimage"},"thumbnailUrl":"https:\/\/epc-assets.elpasoco.com\/wp-content\/uploads\/Road-Work-Alert-3.png","articleSection":["FEATURED NEWS","NEWS","Public Works","Roads","Transportation"],"inLanguage":"en-US"},{"@type":"WebPage","@id":"https:\/\/www.elpasoco.com\/traffic-advisory-week-of-april-29-military-access-mobility-safety-improvement-project\/","url":"https:\/\/www.elpasoco.com\/traffic-advisory-week-of-april-29-military-access-mobility-safety-improvement-project\/","name":"Traffic Advisory \u2013 Week of April 29 Military Access, Mobility &amp; Safety Improvement Project - El Paso County Colorado","isPartOf":{"@id":"https:\/\/www.elpasoco.com\/#website"},"primaryImageOfPage":{"@id":"https:\/\/www.elpasoco.com\/traffic-advisory-week-of-april-29-military-access-mobility-safety-improvement-project\/#primaryimage"},"image":{"@id":"https:\/\/www.elpasoco.com\/traffic-advisory-week-of-april-29-military-access-mobility-safety-improvement-project\/#primaryimage"},"thumbnailUrl":"https:\/\/epc-assets.elpasoco.com\/wp-content\/uploads\/Road-Work-Alert-3.png","datePublished":"2024-04-29T00:05:23+00:00","author":{"@id":"https:\/\/www.elpasoco.com\/#\/schema\/person\/af0619040b0a1a6d6802f809083e3e75"},"breadcrumb":{"@id":"https:\/\/www.elpasoco.com\/traffic-advisory-week-of-april-29-military-access-mobility-safety-improvement-project\/#breadcrumb"},"inLanguage":"en-US","potentialAction":[{"@type":"ReadAction","target":["https:\/\/www.elpasoco.com\/traffic-advisory-week-of-april-29-military-access-mobility-safety-improvement-project\/"]}]},{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/www.elpasoco.com\/traffic-advisory-week-of-april-29-military-access-mobility-safety-improvement-project\/#primaryimage","url":"https:\/\/epc-assets.elpasoco.com\/wp-content\/uploads\/Road-Work-Alert-3.png","contentUrl":"https:\/\/epc-assets.elpasoco.com\/wp-content\/uploads\/Road-Work-Alert-3.png","width":600,"height":600,"caption":"A image of an empty road with text that reads road work alert. News release"},{"@type":"BreadcrumbList","@id":"https:\/\/www.elpasoco.com\/traffic-advisory-week-of-april-29-military-access-mobility-safety-improvement-project\/#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"Home","item":"https:\/\/www.elpasoco.com\/"},{"@type":"ListItem","position":2,"name":"Traffic Advisory \u2013 Week of April 29 Military Access, Mobility &amp; Safety Improvement Project"}]},{"@type":"WebSite","@id":"https:\/\/www.elpasoco.com\/#website","url":"https:\/\/www.elpasoco.com\/","name":"El Paso County Colorado","description":"","potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/www.elpasoco.com\/?s={search_term_string}"},"query-input":{"@type":"PropertyValueSpecification","valueRequired":true,"valueName":"search_term_string"}}],"inLanguage":"en-US"},{"@type":"Person","@id":"https:\/\/www.elpasoco.com\/#\/schema\/person\/af0619040b0a1a6d6802f809083e3e75","name":"DeborahContreras@elpasoco.com","image":{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/secure.gravatar.com\/avatar\/7aba09696bf435293dad517cc9fb7b98e67a8184b99a1c0e0b4981612fff4b87?s=96&d=mm&r=g","url":"https:\/\/secure.gravatar.com\/avatar\/7aba09696bf435293dad517cc9fb7b98e67a8184b99a1c0e0b4981612fff4b87?s=96&d=mm&r=g","contentUrl":"https:\/\/secure.gravatar.com\/avatar\/7aba09696bf435293dad517cc9fb7b98e67a8184b99a1c0e0b4981612fff4b87?s=96&d=mm&r=g","caption":"DeborahContreras@elpasoco.com"}}]}},"publishpress_future_action":{"enabled":false,"date":"2026-05-10 22:06:34","action":"change-status","newStatus":"draft","terms":[],"taxonomy":"category","extraData":[]},"publishpress_future_workflow_manual_trigger":{"enabledWorkflows":[]},"_links":{"self":[{"href":"https:\/\/www.elpasoco.com\/wp-json\/wp\/v2\/posts\/14797","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.elpasoco.com\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.elpasoco.com\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.elpasoco.com\/wp-json\/wp\/v2\/users\/26"}],"replies":[{"embeddable":true,"href":"https:\/\/www.elpasoco.com\/wp-json\/wp\/v2\/comments?post=14797"}],"version-history":[{"count":1,"href":"https:\/\/www.elpasoco.com\/wp-json\/wp\/v2\/posts\/14797\/revisions"}],"predecessor-version":[{"id":14798,"href":"https:\/\/www.elpasoco.com\/wp-json\/wp\/v2\/posts\/14797\/revisions\/14798"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.elpasoco.com\/wp-json\/wp\/v2\/media\/12068"}],"wp:attachment":[{"href":"https:\/\/www.elpasoco.com\/wp-json\/wp\/v2\/media?parent=14797"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.elpasoco.com\/wp-json\/wp\/v2\/categories?post=14797"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.elpasoco.com\/wp-json\/wp\/v2\/tags?post=14797"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}